| |
Product
Design Specification and Process Control
Standard Starter Drive shall establish
a procedure for the receipt, distribution, and control of the latest drawings,
specifications, and tagged samples. This system will assure that the latest
revision of these drawings and specifications are available for use at all
times.
The latest issue or revision of drawings or specifications shall be requested
by the purchasing department and be made a part of any purchase order for
component parts or other material.
Our Engineering Change Order (ECO) system will be established to ensure
that any required changes to drawings or specifications will be properly
reviewed by all concerned departments before they are approved or implemented.
The Engineering Change Order form, prepared by the Quality Control Department,
will list all pertinent information. After completion, the form will be
circulated to all concerned managers for their approval or disapproval.
No changes will be implemented unless there is a 100% consensus of the concerned
departments or there is a resettlement of disagreements by the top management.
All new drawings and drawing changes will be approved by the Engineering
Manager prior to release. |
|
 |